| Previous Topic (RealFlow) | Up (Contents) | Next Topic (Rendition) |
Renderman (RIB) Network Rendering Guide
Submitting RIB render jobs to Deadline
Renderman jobs can be submitted from the Deadline Monitor.

Step 1: Open the Submission Dialog
In the Deadline Monitor, open the RIB Submission Dialog from the Submit menu.
Step 2: Set Your Submission Options
The general Deadline options are:
- Job Name: The name of your job (if left blank, it will default to "Untitled").
- Comment: A simple description of your job (can be left blank).
- Department: Your department (can be left blank).
- Pool: The pool that your job is submitted to.
- Group: The group that your job is submitted to.
- Priority: Your job's priority (0 = lowest, 100 = highest).
- Machine Limit: The maximum number of machines that can render your job at one time (specify 0 for no limit).
- Task Timeout: The number of minutes a slave has to render a task for this job before it requeues it (specify 0 for no limit).
- Limit Groups: The limit groups that your job requires.
- Job Dependencies: Jobs that your job is dependent on.
- Submit As Suspended: Submit your job in the suspended state.
- Delete When Complete: You job is automatically deleted after it completes.
The RIB specific options are:
- RIB Files: The RIB files to be rendered (can be ASCII or binary formatted). These files should be network accessible.
- Frame List: The list of frames to render.
- RIB Renderer: The renderer that will be used to render the RIB files.
- Override Output File: Override the output filename (available for ASCII RIB files only).
- Command Line: Specify additional command line arguments you would like to pass to the RIB renderer. See the documentation for your particular RIB renderer for additional arguments.
Step 3: Submit Your Job
Click the Submit button to submit the job to Deadline.